LJ – Opera and ballet LJ

Finished:

2008

Contractor:

SCT d.d.

Client:

Ministrstvo za kulturo Republike Slovenije

Project details:

The total depth of the construction pit reaches approx. 17.00 m in relation to the area of ​​the terrain. To protect the construction pit or of the walls of the stage tower, an anchored reinforced concrete diaphragm was constructed, which, due to the specificity of the stage tower (there are no spandrel structures), must be considered as a permanent construction.

LJ – Opera and ballet LJ

Finished:

2008

Investor:

Ministrstvo za kulturo Republike Slovenije

Contractor:

SCT d.d.