Reconstruction of the equipment of the NEK dam

Finished:

2016-2018

Contractor:

Kostak d.d.

Client:

HESS d.o.o.

Project details:

As part of the project, a bridge was designed that goes over six (6) overflow fields and 2 retaining walls along the banks of the Sava River.