The bridge over the Krka in KOSTANJEVICA

Finished:

2009

Contractor:

SCT d.d. in CGP d.d.

Client:

DRSC d.d.

Project details:

Length:

176 m

Maximum range:

32 m

Technology:

gradual pushing

The bridge over the Krka in KOSTANJEVICA

Finished:

2009

Investor:

DRSC d.d.

Contractor:

SCT d.d. in CGP d.d.