Viaduct PODGRIČ (6-6/1)

Finished:

2010

Contractor:

PRIMORJE d.d.

Client:

DARS d.d.

Project details:

Length:

342/377 m

Maximum range:

45,00 m

Technology:

gradual pushing

Viaduct PODGRIČ (6-6/1)

Finished:

2010

Investor:

DARS d.d.

Contractor:

PRIMORJE d.d.