Viaduct ŠENTOŽBOLT (6-6)

Finished:

2005

Contractor:

NGR d.d.

Client:

DARS d.d.

Project details:

Length:

537/407 m

Maximum range:

70 m

Technology:

gradual pushing

Viaduct ŠENTOŽBOLT (6-6)

Finished:

2005

Investor:

DARS d.d.

Contractor:

NGR d.d.